During the assembly process, all parts are professionally mounted on the object. For correct assembly, our employees have access to 2 overhead cranes, each with 2x 12.5-ton winch; this gives us the option of lifting 50 tons. These winches allow all parts to be mounted safely and without damage. Naturally, factory settings from sheet metal parts to add-on parts are taken into account. Much attention is paid to this process. After the object has been completely assembled, an extensive inspection is carried out for correct operation.
Tadano HK60
We recently completely renewed the Tadano HK 60 of Abschleppdienst Meyer. This rusty, yellow crane has now been transformed into […]